You don't have javascript enabled. Good luck with that.
Pencarian
Fase awal pengerjaan pembangunan flyover Latumeten
.
photo Istimewa - Beritajakarta.id

Jakarta Reroutes Traffic as Latumeten Flyover Project Begins

Commuters in West Jakarta should expect traffic detours as work begins on the Latumeten Flyover in Grogol Petamburan.

We are ensuring the road remains functional

The year-long integrated design-and-build project is scheduled to run through December 2026.

According to Syafrin Liputo, Head of Jakarta Transportation Agency (Dishub), the construction is split into five distinct zones, with work progressing on different timelines for each area.

MRT Phase 2 Construction Around Thamrin Entrance 4 Starts, Traffic Rearranged

"We are ensuring the road remains functional by providing two replacement lanes through sidewalk-side widening along the work area,” he explained, Wednesday (1/28).

Despite detour phases in multiple construction zones, the agency is working to keep traffic flowing. Drivers should avoid Jalan Prof. Dr. Latumeten and Jalan Makaliwe Raya to reduce bottlenecks.

Recommended alternatives for those heading North from Jalan Daan Mogot include Jalan Pangeran Tubagus Angke and Jalan KH Moch Mansyur.

Linked News
Popular News indeks
  1. Cilandak Drainage Upgraded to Mitigate Flooding

    access_time27-01-2026 remove_red_eye867 personTiyo Surya Sakti
  2. TransJabodetabek Expansion, a Strategic Step to Increase Public Transportation Use

    access_time26-01-2026 remove_red_eye423 personFakhrizal Fakhri
  3. Jakarta Prepares OMC and 200 Excavators to Prevent Flood

    access_time26-01-2026 remove_red_eye370 personDessy Suciati
  4. Jakarta Showers to Make Way for Partly Cloudy Skies

    access_time30-01-2026 remove_red_eye355 personDessy Suciati
  5. Several Microtrans Routes Diverted

    access_time31-01-2026 remove_red_eye348 personAldi Geri Lumban Tobing
close